Y25t prototype removed from test site 3.05.2012

Today we removed the last part of the Y25t prototype from our test site off the Tuscan coast. Because this prototype was based on a traditional mooring system, we used a barge-mounted crane for the operation.
The Y25t served us very well. It ran continuously for several days during 2011, allowing us to validate completely our computerised “wave to wire” models.