From Twitter: At All-Energy we will be able to take orders for delivery H1 2013. Due to present backlog, we cannot offer delivery of new orders in H2 2012 more

Underwater cable to the user

COMPARISON WITH OFFSHORE WIND The consenting process for the installation of the cable is similar to the one usually applied to offshore wind. The main difference is that usually the installations based on R38 or R115 machines top up at a few megawatts of power, and therefore the cable is much smaller than the one used in offshore wind parks. The installation process does not need a large, purpose built vessel, but can be performed by a standard towboat on whose deck the cable laying mechanism has been temporarily welded.

AUTHORIZATION PROCESS The authorization process for underwater cable laying and for its landfall is usually well known and documented in any jurisdiction, and the fact that on the offshore end of the cable there is a Wave Energy Park instead of, say, an offshore platform, should not introduce any uncertainty in the process.

GORGONA ISLAND In the case of Gorgona Island, in the north Tyrrhenian sea, the park authorities gave the go ahead to the cable laying on the basis of the considerations above, even if the island is one of the most protected and pristine areas in the whole Mediterranean sea.

CABLE LANDFALL AND TRENCHING The cable will make landfall preferably in a (small) harbor, to minimize the environmental impact at the site. However, considering the very reduced diameter of the cable itself usually it is easy to obtain the permits to lay it even on valuable sea floor. In this case it is preferable not to trench the cable, and either to leave it on the surface of the sea floor possibly inserting mattresses every now and then to stabilize it (if there is no danger of anchoring or dragnet fishing) or to include it in a steel pipe otherwise. If trenching cannot be avoided in certain parts of the cable path, it will need to be carefully planned. In this case a study of the sea floor with side scan sonar and possibly by use of video cameras might be needed.

POSSIBLE INTERFERENCE WITH DRAGNET FISHING The presence of the cable may limit the possibility to perform some forms of fishing, specifically dragnet fishing if the cable has not been buried. This might be a problem in certain locations, and a mitigation of the problem can come either from the trenching of the cable, or from the laying of the cable inside or on the boundary of protected areas where dragnet fishing is not allowed, or finally by actively including the local fishing community in the activities of the Wave Energy Park as a form of compensation for the limitation on their activity. The specific solution will depend on the site and there is no general one.